The European Energy Performance of Buildings Directive, EPBD (EU) 2024/1275, is known in Italy as the ‘green homes directive’. The name is misleading, because the part likely to have the most immediate impact is not about homes: it concerns offices, shops, hotels, healthcare facilities, schools and industrial buildings.
For those managing commercial properties, there is one practical takeaway. The directive does not require every building to be renovated: it requires building energy consumption to be understood, the worst-performing buildings to be brought out of the lowest-performing segment, and buildings to be equipped with systems that control their technical installations.
The EPBD is the directive that sets European energy-performance targets for the building stock, with a view to decarbonisation by 2050. It does not apply directly to property owners: it binds Member States, which must transpose it into national law.
This explains why much of the alarmist coverage has been inaccurate. The directive does not require an owner to start construction work by a specific date: it requires states to achieve measurable results across their building stock, while national legislation determines how.
For non-residential buildings, however, the practical implications are much the same. European targets translate into requirements for new buildings, major renovations, technical systems and equipment, and the relevant deadlines have already been set.
This is the uncertainty to keep in mind when reading any content on the subject, including this article.
The transposition deadline was 29 May 2026, and Italy reached that deadline without transposing the directive. The national building renovation plan was also still outstanding, even though it had to be submitted by 31 December 2025, leading to the opening of an infringement procedure.
In practice, this means two things. First, the thresholds, exemptions and implementation procedures in Italy will be those established by the transposition decrees, which must be reviewed when they are published. Second, the European deadlines remain the reference point for planning: anyone who waits for the decree before assessing their buildings will end up playing catch-up.
| Requirement | Who it applies to | When |
|---|---|---|
| Minimum energy performance standards (MEPS) | Non-residential buildings in the worst-performing segment of the building stock | Out of the worst-performing 16% by 2030 and out of the worst-performing 26% by 2033 |
| Zero-emission buildings | New public buildings | From 1 January 2028 |
| Zero-emission buildings | All new buildings | From 1 January 2030 |
| Solar installations | New non-residential buildings larger than 250 m² | By 31 December 2026 |
| Solar installations | Non-residential buildings larger than 500 m² undergoing major renovation | By 31 December 2027 |
| Building automation and control systems (BACS) | Non-residential buildings with systems above 290 kW | Already required from the end of 2024 |
| Building automation and control systems (BACS) | Non-residential buildings with systems above 70 kW | By the end of 2029 |
| Electric vehicle charging points | New buildings or buildings undergoing major renovation with more than 5 parking spaces | At least one charging point and pre-cabling for half of the parking spaces |
| Electric vehicle charging points | Existing non-residential buildings with more than 20 parking spaces | By 1 January 2030 |
The dates are those set out in the directive: national transposition may clarify them, introduce exemptions and define verification procedures.
This is the most misunderstood point. MEPS do not establish one energy class for every building: they set a relative threshold, calculated against the national building stock existing on 1 January 2020 and measured in kWh per square metre per year.
By 2030, non-residential buildings must move out of the segment containing the worst-performing 16% of the building stock; by 2033, they must move out of the worst-performing 26%. In practice, the requirement affects the least energy-efficient properties first. To know whether a building is at risk, its actual specific energy consumption must be known, not just the class stated on its energy performance certificate (APE).
The energy performance certificate is also changing: the directive provides for a harmonised scale from A to G, with class A reserved for zero-emission buildings and class G corresponding to the least efficient buildings.
While waiting for the decrees, the useful work is not legal work but fact-finding:
The same requirement has different implications depending on the type of property:
European requirements and national incentives follow separate timelines, and it is worth accounting for both in planning.
The Conto Termico scheme is also open to businesses for work on non-residential buildings, including insulation, efficient lighting and building automation systems, while the new Transition 5.0 Plan also covers interconnected intangible assets such as monitoring software. These measures have their own eligibility windows: anyone planning work only around the directive’s deadlines risks missing the incentive window.
Three different pathways that largely require the same data.
The EPBD is legislation and concerns building performance. LEED, BREEAM and WELL certifications are voluntary and serve market needs. ISO 50001 is a management system that structures internal processes.
Those who approach them separately end up collecting the same information three times. Those who establish energy-consumption and environmental-condition monitoring once can meet the information needs of all three and will also be prepared when the transposition decrees arrive.
Of all the deadlines, the automation requirement is the most tangible for those managing existing buildings, because it does not require changes to the building envelope.
The directive requires non-residential buildings with heating systems above a certain capacity to be equipped with building automation and control systems, where technically and economically feasible: the 290 kW threshold is already предусмотрed, while the 70 kW threshold applies by the end of 2029.
Such a system must be able to monitor and analyse energy consumption, detect losses in system efficiency and allow controls to be adjusted. These are the functions of a BMS, which can now also be provided for medium-sized and small buildings through lighter cloud-based solutions, as explained in our article on BMS and building automation.
Everything the directive requires organisations to demonstrate relies on the same foundation: knowing how much energy each building consumes, how consumption changes over time and under what comfort conditions.
UTwin’s energy management software covers this area: the supply of smart meters and IoT sensors for energy, water, gas and environmental parameters; cloud-based data collection; visualisation on the building model; AI algorithms that detect anomalies; and remote system control based on outdoor weather and occupancy.
For buildings where a traditional BMS does not offer a sufficient return on investment, such as retail outlets, supermarkets, hotels, nursing homes and small premises, the platform works as a light BMS, with CAPEX up to 70% lower. Where a BMS already exists, it integrates with it and enhances its automation capabilities.
The integrated maintenance software (CMMS) tracks maintenance work, providing the documentation needed to demonstrate compliance.
No, not directly. The directive requires Member States to achieve targets for their national building stock, while transposition legislation determines the obligations and procedures. For non-residential buildings, minimum energy performance standards apply to the worst-performing segment of the building stock, not to every building.
The nearest deadlines are the requirement for solar installations on new non-residential buildings larger than 250 square metres by 31 December 2026 and, for buildings larger than 500 square metres undergoing major renovation, by 31 December 2027. This is followed by the requirement for automation and control systems above 70 kW by the end of 2029.
By the 29 May 2026 deadline, transposition had not been completed, and the national building renovation plan was also delayed. The Italian implementation rules, including any exemptions, will be those established by the transposition decrees.
The directive provides for a harmonised scale from A to G, with class A reserved for zero-emission buildings and class G for the least efficient buildings, as well as a certificate containing more information that can be compared across Europe.
The BACS requirement is set out in the directive itself for non-residential buildings whose technical systems exceed specified capacity thresholds, where technically and economically feasible. It is the measure with the greatest impact on existing buildings because it concerns technical systems rather than the building envelope.
The first step costs almost nothing: list the buildings in your portfolio along with their floor area, annual specific energy consumption, heating-system capacity, presence of an automation system and number of parking spaces.
That table already shows which properties will be affected first and which requirements will arrive soonest, turning a directive perceived as threatening into a structured, prioritised action plan.