
The facility has been inaugurated in 2020 and is used by Amazon to stock larger products. The distribution center is a sustainable structure, which integrates systems for energy saving by reducing the environmental footprint thanks to reduced levels of emissions. During the construction phase, sustainability principles and cutting-edge solutions were applied in this direction, such as the installation of solar panels for a total installed power of 2 MW, systems for reducing energy consumption, LED lights for lighting, a system for cooling and heating of the rooms with energy recovery, hot water supply without the use of methane gas, windows and roofing materials that promote thermal insulation.
Digital Twin creation for external areas Drones / Scan Activities Digitalization of the electrical plant layout, black water, tanks and related inspection wells. Information enrichment with technical parameters
Increasing efficiency during operations and construction Reducing costs from changes during construction activities Increasing collaboration among different stakeholders involved during construction phase
